Deltapoint


University of Bolton | GAM5001-18

Redesign

[IMAGE] Due to some unforseen cercumstances I have had to change my project and move to something non-VR. This is annoying because it means I have less time to produce my game however I am determined to produce something I am happy with and I plan to go back to my VR project in future in my own time when I am able as I really like the concept.

My new design idea i... Read more


Project Plan

Overview

Assault of Democracy is a first person VR game where the player has to protect their stockpile from other survivors of the apocalypse who are all fighting for resources. Assault of Democracy takes gameplay inspiration from Robo Recall (Robo Recall, 2019) and Raw Data (Raw Data, 2016) and an art style taken from games like The Last of Us (The Last of Us, 2013).


USP’s

Engaging
Intuitive gameplay/controls
Immersive


Technical Outli... Read more


Moodboard

[IMAGE] [IMAGE]
This Bastion skin from Overwatch matches the theme of the game in a post-apocalyptic environment that is overgrown and getting a bit rusted/dated.
Also from Overwatch I want my weapons to be a similar style to the guns used in the Overwatch universe, the example... Read more


Initial Design

As part of my university course, I have to create a game based around the theme: reclaimed while posting regular dev blogs and sticking to scheduled milestones.

My initial idea for the game is to make some kind of post-apocalyptic shooter taking inspiration from games such as Overwatch, Left4Dead 2 and The Last of Us.